Draft Restrictions

Updated: 11 April 2016

plimsollmark

The following are Maximum Draft Recommendations under Normal Conditions

 

NOTE:  

Due to the strong currents in the vicinity of the Matagorda Ship Channel, all vessels will tranist the Matagorda Ship Channel at a "safe naviagble transit speed" as detemined by the Pilot onboard.    Any reduction or limitation of RPMs by the vessel or crew could result in Delays, Detentions or Cancellations until satisfactory conditions exist.

 

 

CCND Liquid Pier Berths (LPN and LPS)
Effective: 10 May 2023
33 Feet 00 Inches SALTWATER
under Normal Conditions
CCND General Cargo Dock (GCD)
Effective: 10 May 2023
33 Feet 00 Inches SALTWATER
under Normal Conditions
CCND Dry Bulk Dock (DBD)
Effective: 10 May 2023
33 Feet 00 Inches SALTWATER
under Normal Conditions
CCND Multi Purpose Dock (MPD)
Effective: 11 April 2016
UNKNOWN
under Normal Conditions
Please Contact CCNfor depth at this berth
Phone 361-987-2813
ALCOA Private Channel to R-10 Basin and Basin
Effective: 11 April 2016
UNKNOWN
under Normal Conditions
Please Contact Alcoa Point Comfort
for depth at this berth
Phone 361-987-6270
ALCOA Private Channel to R-52 Basin and Basin
Effective: 11 April 2016
UNKNOWN
under normal Conditions
Please Contact Alcoa Point Comfort
for depth at this berth
Phone 361-987-6270